I posted this because I think this is absolutely silly. A hydrogen-powered train that runs on a low-volume 9-mile track? Why on earth couldn’t this just run on gantry-provided electric power? I guess it’s fine as an experimental trial system, but let’s not pretend that hydrogen is better than electric in basically every rail application imaginable.